Luxa Riparo Pura Carport — Installation guide
Free-standing aluminium carport with slatted aluminium roof and integrated drainage. 10 assembly steps from foot plates to corner sealing. ~3 hours, 2-person team.
Total install time
Approx. 3 hours · 2 installers
This guide is a project reference prepared from the same product logic used for planning. Drawings, dimensions and torque values are nominal and subject to project tolerance.
HOW IT'S BUILT
ASSEMBLY · 10 STEPS
Step-by-step installation
STEP D1 · 01/10
Place the foot plates
First action on the slab — sets the entire system geometry.
Sub-steps
- 1Mark the four corner positions according to the site survey.
- 2Verify W x P footprint and check both diagonals.
- 3Place the ground connections with feeds facing inside.
- 4Drill and fix the plates to the floor.
- 5Check that all plates are level.
- 6Confirm the layout before column assembly.
Specifications
Keep the feed/open side facing the system interior.
- Wrong orientation will affect water outlet alignment.
TOOLS
Tape measure, chalk line, hammer drill, torque wrench, spirit level
TIME
30-45 min