INSTALLATIONSGUIDE
26 steg till en färdig Fristående motoriserad pergola.
Fristående aluminiumpergola med motoriserat lameltak — sex omkretsstorlekar (3×3 → 4×6) från en gemensam 26-stegsprocedur.
-
01
Förbered hörnanslutningssatser
Pre-build the four corner connection sets — set projection vs width orientation now.
STOMME12 min -
02
Bygg främre U-ramen
Insert the front C-1 gutter into B-1/B-2 pillars to form the front U-frame on the ground.
STOMME18 min -
03
Bygg bakre U-ramen
Repeat for the rear C-2 gutter into A-1/A-2 pillars — keep both U-frames square.
STOMME18 min -
04
Lyft U-formade ramar
Lift both U-frames simultaneously — two installers per frame, mind the powder coating.
STOMME25 min -
05
Montera vänster sidoprofil D-1
Install the left D-1 side perimeter profile between the two U-frames.
STOMME18 min -
06
Montera höger sidoprofil D-2
Install the right D-2 side perimeter profile — frame is now closed.
STOMME18 min -
07
Kontrollera diagonaler och dräneringsproppar
Verify diagonals match the size table (3×3: 386 · 3×4: 466 · 3×5: 554.5 · 4×4: 527.5 · 4×5: 602.4 · 4×6: 683.7 cm) and seat drainage plugs.
STOMME15 min -
08
Montera F-rännor i utskjutningsriktning
Mount F gutters in the projection direction.
STOMME18 min -
09
Montera E-rännor i breddriktning
Mount E gutters in the width direction — perimeter complete.
STOMME18 min -
10
Fixera översta rännor uppifrån
Fix all top gutters from above with 3.9 mm screws.
STOMME15 min -
11
Täta gummiskarvar
Seal rubber junctions at all gutter intersections — neutral silicone bead.
STOMME12 min -
12
Förbered standardlameller
Pre-cut and prepare the standard PN-LM-500 lamellas to width.
LAMELLER20 min -
13
Förbered motorlamellen
Prepare the dedicated PN-LM-501 motor blade — drive coupling on motor side.
LAMELLER15 min -
14
Montera motorn på D-1-profilen
Mount the PN-MT-500 motor on the D-1 profile per code map orientation.
LAMELLER25 min -
15
Montera motorlamellen
Install the motor blade onto the rotation pin first — verifies free movement.
LAMELLER20 min -
16
Justera motorarmen
Adjust the motor arm angle so the motor blade closes flush.
LAMELLER18 min -
17
Montera resterande lameller
Insert the remaining standard lamellas one by one — verify rotation by hand.
LAMELLER30 min -
18
Montera rörelsearmar
Install the PN-AR-500 movement arms linking all blades to the motor blade.
LAMELLER25 min -
19
Montera rörelsearm-kåpor
Cap with the PN-CV-500 movement-arm cover profiles.
LAMELLER15 min -
20
Montera pelarkåpor
Mount the PN-DZ-510 pillar covers (4 corners).
AVSLUTNING12 min -
21
Montera bakre avslutningsprofil
Install the PN-CV-501 rear cover profile.
AVSLUTNING12 min -
22
Montera främre avslutningsprofil
Install the PN-CV-502 front cover profile.
AVSLUTNING12 min -
23
Montera hörnkåpor
Install the corner cover trims at the four upper corners.
AVSLUTNING15 min -
24
Dra motorkablar
Route the motor cables down through the designated pillar channel.
AVSLUTNING15 min -
25
Montera LED-list och PVC-kåpa
Install the LED strip into the gutter recess and snap on the PVC cover.
AVSLUTNING18 min -
26
Färdigställ elektrisk koppling
Complete electrical wiring at the controller — verify motor direction and end-stops.
AVSLUTNING30 min
Om denna fristående motoriserad pergola-installationsguide
Luxa Aperio 500 — Fristående motoriserad pergola · LuxaShade aluminium roof family. 26 steps · 2 installers · Edition 2026.1.
EN AW-6063 T6 alloy · QUALICOAT class 2 powder coating · EN 1991-1-4 wind-load rated · RTS-compatible motor wiring on motorised variants.
Varför följa det officiella PONARC × LuxaShade-förfarandet
- EN 1991-1-4 · QUALICOAT class 2 · EN AW-6063 T6
- RTS-compatible motor wiring (motorised variants)
- Gutter slope 1.5% · drainage inside columns
- Edition 2026.1 · Januari 2026 · SV