FRAME
·
STEP D4 · 04 OF 26
04
Lift the U-shaped frames
Lift both U-frames simultaneously — two installers per frame, mind the powder coating.
SPECIFICATIONS
TIP
WATCH OUT
TOOLS
TIME
25 min
About step 4 of the Luxa Aperio 500 installation
Lift the U-shaped frames · FRAME · 26 step · Luxa Aperio 500 (free-standing motorised pergola)
Lift both U-frames simultaneously — two installers per frame, mind the powder coating.