BLADES
·
STEP D10 · 10 OF 18
10
Install first blade
Install the first blade — verify free rotation and flush closed position.
SPECIFICATIONS
TIP
WATCH OUT
TOOLS
TIME
15 min
About step 10 of the Luxa Sereno 500M installation
Install first blade · BLADES · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)
Install the first blade — verify free rotation and flush closed position.