Back to ponarc.com
BLADES · STEP D12 · 12 OF 18
12

Connect manual linkage

Connect PN-SC-500 manual linkage — all blades must move together.

Connect manual linkage — illustration
Fig. 12 — Connect manual linkage

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      20 min

      About step 12 of the Luxa Sereno 500M installation

      Connect manual linkage · BLADES · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)

      Connect PN-SC-500 manual linkage — all blades must move together.

      Nearby steps in this installation