BLADES
·
STEP D8 · 08 OF 18
08
Install blade side rails
Slide PN-LR-500 blade side rails into the frame — pre-set pivot positions.
SPECIFICATIONS
TIP
WATCH OUT
TOOLS
TIME
18 min
About step 8 of the Luxa Sereno 500M installation
Install blade side rails · BLADES · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)
Slide PN-LR-500 blade side rails into the frame — pre-set pivot positions.