BLADES
·
STEP D8 · 08 OF 16
08
Install blade rails (PN-RA-500)
Slide PN-RA-500 blade rails into the frame channels — pre-set pivot positions.
SPECIFICATIONS
TIP
WATCH OUT
TOOLS
TIME
18 min
About step 8 of the Luxa Sereno 500M Wall installation
Install blade rails (PN-RA-500) · BLADES · 16 step · Luxa Sereno 500M Wall (wall-mounted manual bioclimatic pergola)
Slide PN-RA-500 blade rails into the frame channels — pre-set pivot positions.