Back to ponarc.com
FRAME · STEP D6 · 06 OF 16
06

Install side gutters (front to wall)

Install left and right side gutters — wall-side ends fix to PN-WM-500 ledger.

Install side gutters (front to wall) — illustration
Fig. 06 — Install side gutters (front to wall)

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      22 min

      About step 6 of the Luxa Sereno 500M Wall installation

      Install side gutters (front to wall) · FRAME · 16 step · Luxa Sereno 500M Wall (wall-mounted manual bioclimatic pergola)

      Install left and right side gutters — wall-side ends fix to PN-WM-500 ledger.

      Nearby steps in this installation