Back to ponarc.com
FRAME · STEP D3 · 03 OF 18
03

Secure the gutter-to-pillar joints

Screw gutter and pillar profiles together — IMBUS bolts through the alloy mating block.

Secure the gutter-to-pillar joints — illustration
Fig. 03 — Secure the gutter-to-pillar joints

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      15 min

      About step 3 of the Luxa Aperio 800 installation

      Secure the gutter-to-pillar joints · FRAME · 18 step · Luxa Aperio 800 (motorised retractable louvre roof)

      Screw gutter and pillar profiles together — IMBUS bolts through the alloy mating block.

      Nearby steps in this installation