Back to ponarc.com
FRAME · STEP D2 · 02 OF 14
02

Insert the pillars into the ground connections

Insert the front PN-VP-100 pillars onto ground connections — plumb in two directions.

Insert the pillars into the ground connections — illustration
Fig. 02 — Insert the pillars into the ground connections

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      18 min

      About step 2 of the Luxa Vetra installation

      Insert the pillars into the ground connections · FRAME · 14 step · Luxa Vetra (wall-mounted glass / polycarbonate veranda)

      Insert the front PN-VP-100 pillars onto ground connections — plumb in two directions.

      Nearby steps in this installation