Back to ponarc.com
FRAME · STEP D8 · 08 OF 18
08

Install the rail carrier apparatus and rail profiles

Verify frame square and re-torque — every mm here multiplies on the rail later.

Install the rail carrier apparatus and rail profiles — illustration
Fig. 08 — Install the rail carrier apparatus and rail profiles

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      15 min

      About step 8 of the Luxa Aperio 800 installation

      Install the rail carrier apparatus and rail profiles · FRAME · 18 step · Luxa Aperio 800 (motorised retractable louvre roof)

      Verify frame square and re-torque — every mm here multiplies on the rail later.

      Nearby steps in this installation