Back to ponarc.com
FRAME · STEP D4 · 04 OF 18
04

Install rear carrier gutter

Install the rear PN-GU-500 carrier gutter — slope 1.5% toward the front.

Install rear carrier gutter — illustration
Fig. 04 — Install rear carrier gutter

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      18 min

      About step 4 of the Luxa Sereno 500M installation

      Install rear carrier gutter · FRAME · 18 step · Luxa Sereno 500M (manual bioclimatic pergola)

      Install the rear PN-GU-500 carrier gutter — slope 1.5% toward the front.

      Nearby steps in this installation