Back to ponarc.com
FINISH · STEP D24 · 24 OF 24
24

Route motor cables and complete electrical wiring

Route motor cables through front pillar and complete electrical wiring (RTS-compatible).

Route motor cables and complete electrical wiring — illustration
Fig. 24 — Route motor cables and complete electrical wiring

SUB-STEPS

    SPECIFICATIONS

      TIP

      WATCH OUT

      TOOLS

      TIME

      30 min

      About step 24 of the Luxa Aperio 500 Wall installation

      Route motor cables and complete electrical wiring · FINISH · 24 step · Luxa Aperio 500 Wall (wall-mounted motorised pergola)

      Route motor cables through front pillar and complete electrical wiring (RTS-compatible).

      Nearby steps in this installation